China wheel-end procurement Send a drawing or fitment brief

China Procurement Desk

About ARP and its independent sourcing role

ARP is an independent China sourcing and procurement coordination service for wheel-end components. We clarify specifications and organize supplier evidence for B2B purchasing teams.

Send your spec

Prepare your RFQ

  • Vehicle or OE number
  • Size, load and interface
  • Quantity and destination
Illustration of a wheel-end sourcing review with a part and a caliper

Why the drawing travels with the quote

Two suppliers can use the same part name for different dimensions or pack counts. A wheel nut description may leave the seat profile unstated, while a ring quote may list its diameters without a chamfer or register depth. For a nominal 66.6 mm to 57.1 mm ring, record 66.6 mm as the wheel center bore and 57.1 mm as the hub pilot. Neither diameter specifies the ring depth. Linking the drawing revision to each quote line gives purchasing and inspection teams the same reference.

A stocked part can work when the supplier's drawing matches the intended interface. A custom part is a route for a missing geometry, but it adds tooling, sample approval and potential change-control costs.

Evidence before commitment

Supplier records

Track the site, quote revision and offered SKU. Keep management-system records separate from any product test report.

Sample check

Record the sample ID and lot, then agree on dimensions and interfaces to check. For clip-on weights, compare the clip to the intended flange profile.

Document scope

Match the issuer, scope, product identifier, revision and market to the offered part before the buyer relies on a document.

Independent inspection

Coordinate with a third party when the project calls for it. Record the agreed sampling and acceptance rules before inspection.

Buyer release

Record which drawing and sample the buyer approved. Request a fresh review if the material, interface or revision changes.

Shipment records

Reconcile packing list, carton marks and lot references. A single supplier can simplify lot mapping. A split order can broaden SKU coverage but needs separate line and lot mapping for each supplier.

Bring the part number and the application

The procurement desk can identify which inputs are still needed to compare supplier responses.

Contact ARP